Wuxi Huaguang Boiler Water Treatment Engineering Co., Ltd. Established
2008
2008
The company was renamed as "Wuxi Guolianhua Optoelectronic Station Engineering Co., Ltd."
2010
2010
In December, market orders exceeded the 1 billion mark for the first time;
2013
2013
In May, INDORAMA (a Fortune 500 company) in Indonesia 2X65t/h
project was put into operation In December, the first photovoltaic power station Wuxi Yimian project was successfully connected to the grid
2014
2014
In June, the DUMAI3X130th project of Golden Eagle Group (a Fortune 500 company) in Indonesia was put into operation
2015
2015
In October, Sinar Mas Group (a Fortune 500 company) Indonesia PT.SAMRT 2X10MW project was put into operation
In December, the first ground large-scale photovoltaic power station Leping project was successfully connected to the grid
2016
2016
In June, the first African project, INDORAMA Zhai Negal 1X20MW project, was put into operation
In November, the company signed a strategic cooperation agreement with GCL New Energy
2017
2017
In November, Xi'an Datang Jiangsu Branch was registered and established
2018
2018
04 month, Xi'an Datang Wuxi Branch was registered and established
In December, the 1X130t/h boiler island of Zhenglong, Vietnam was put into operation with automatic operation
2019
2019
In May, Huaguang Power Station established the Environmental Division
In May, the groundbreaking ceremony of the Xigang Thermal Power Project of the Belt and Road Project of Huaguang Power Station was held
2020
2020
In August, the first phase of the main plant of Cambodia Westport Thermal Power Project was capped
2021
2021
In January, the first phase of Cambodia's Xigang Thermal Power Project was put into trial operation
In March, the new energy division was established
2022~Now
2022
In March, Xi'an Datang Electric Power Design and Research Institute Co., Ltd. was renamed as Huaguang Environmental Protection Energy (Xi'an) Design and Research Institute Co., Ltd